Quality & certifications

The paperwork behind the weld

Structural steel fails quietly, at a connection nobody looked at. This is what we look at, and what we can show you.

Registrations and certifications

CIDB

CIDB G7

Registered with the Construction Industry Development Board Malaysia at Grade 7, unlimited value, in the structural steel and building works categories.

ISO

ISO 9001:2015

Quality management system covering design, fabrication and erection, audited annually with non-conformance closure tracked to root cause.

D1.1

Welder qualification

Welders tested and qualified to AWS D1.1 and EN 287 for the positions each project actually requires, with validity tracked per welder.

NDT

Shop and site inspection

100% visual examination of structural welds, with ultrasonic or magnetic particle testing on the joints your engineer designates as critical.

CAL

Equipment calibration

Cranes, torque wrenches, DFT gauges and welding machines on a calibration register, certificates available in the tender pack.

Codes we design and build to

AreaStandard
Structural designEurocode 3 (EN 1993) / BS 5950 / AISC 360
LoadsMS 1553-1 (Malaysian loading) / ASCE 7
WeldingAWS D1.1 / EN 1090-2 / BS EN 287
ExecutionEN 1090-2 execution class EXC2 - EXC3
Corrosion protectionISO 12944 / SSPC system specification
BoltingEN 14399 HR10.9 / ASTM A325 A490
Mill materialsSS400 / SM490 / S355JR with mill certificate

Hold points you are welcome to attend

Before concrete

Anchor bolt and base plate setting-out surveyed and signed off before the pour. This is the cheapest inspection on the whole project.

During fabrication

Fit-up and weld inspection at the yard, with photographs logged against the assembly number before coating goes on.

Before coating

Surface profile and dusting grade checked, ambient temperature and dew point recorded, DFT measured after cure.

After erection

Plumb and level survey, torque verification on a sampling basis, and a closing-out walk with your engineer present.

Site safety

Method statements, permit-to-work for lifts and hot work, daily toolbox briefs, and scaffolding signed by a competent erector. Our site record is maintained and available for tender review.

Have drawings, or just an idea?

Send us your span, load requirements and site location. You will get a budgetary steel tonnage estimate and a fabrication timeline within 2 working days — no obligation.