Automotive parts warehouse
Portal frame design, fabrication and erection with 1.2m rooflight strip and four dock levellers. Delivered during a live-operation shutdown window.
- 18,400 sq ft
- 410 t
- 2024
Projects
Selected projects across industrial, commercial and infrastructure sectors. Tonnage and programme figures are as-built.
Portal frame design, fabrication and erection with 1.2m rooflight strip and four dock levellers. Delivered during a live-operation shutdown window.
Composite beam-and-deck frame carrying 12kN/m² process loading, built-up plate girders and two crane rails to a 5t gantry.
Insulated panel support steel with thermal-break details, plus an elevated plant room platform on independent columns.
Curved roof canopy over an existing retail link, laser-cut feature screens and a 34m span access bridge installed over night shifts.
Vibration-controlled mezzanine inside a live cleanroom, hot work restricted to a nightly window, all welding executed with fume extraction.
Weathering-steel truss fabricated in Selangor, barged upriver and launched in a 19-hour continuous operation.
Client names and full photo sets are shared under NDA. Ask us for the case study pack matching your building type.
Send us your span, load requirements and site location. You will get a budgetary steel tonnage estimate and a fabrication timeline within 2 working days — no obligation.