About
A workshop that grew into a contractor
STEELWORK started as a cutting and drilling shop serving larger fabricators in Selangor. Clients kept asking us to take the whole job, so we hired the design engineers, then the erection crews.
That history still shapes how we quote. We price what the workshop actually has to do, and we do not sell a programme the yard cannot hold. When a job is beyond our crane capacity or our welding positions, we say so at the enquiry stage instead of at week six.
Today the team runs two fabrication yards, an in-house detailing office and erection supervisors who stay with a project from first lift to handover. We work in Malay, English and Mandarin because on a Malaysian site all three get spoken on the same afternoon.
Milestones
- 2009
Cutting and drilling service shop opens in Subang, supplying other fabricators.
- 2013
First own-design portal frame delivered; CIDB registration at Grade 5.
- 2017
Second yard opens at Sungai Buloh with a 120-tonne crane and enclosed blasting bay.
- 2020
Detailing office fully on Tekla; ISO 9001 certification obtained.
- 2024
CIDB upgraded to G7; multi-storey process-loading frames added to the portfolio.
How we work
Say it at the enquiry
If a span, a load or a date is a problem, it gets raised before the contract, not after.
One contact, accountable
The person who quotes your job answers for it through erection. No relay through three departments.
Weight and record
Traceable material, tagged members and documented inspections — the audit trail is part of the deliverable.
Local crews, local hours
Erection teams on payroll, working Malaysian public holidays and site curfews as a known constraint, not a surprise.
Who you deal with
A structural design lead, a detailing lead, a fabrication controller and an erection supervisor are named on every quotation. You get their mobile numbers before you sign anything.
Have drawings, or just an idea?
Send us your span, load requirements and site location. You will get a budgetary steel tonnage estimate and a fabrication timeline within 2 working days — no obligation.